|
WATER SITUATION IN BENGALURU |
Water Yield in the Catchment
Runoff yield in Bangalore is calculated spatially based on the empirical equation (eq 1) using GIS Figure 5.1: Runoff (mm/year) in Bangalore
Catchment wise water yield analysis indicates that about 49.5% (7.32 TMC) in the Vrishabhavathi valley (including Arkavathi and Suvarnamukhi), followed by 35.2% (5.2 TMC) in Koramangala Challaghatta valley and 15.3% (4.2 TMC) in Hebbal valley and the total annual water yield is about 14.80 TMC.
|
Contact Address : | |||
Dr. T.V. Ramachandra Energy & Wetlands Research Group, Centre for Ecological Sciences, New Biological Sciences Building, 3rd Floor, E-Wing, Lab: TE15 Indian Institute of Science, Bangalore – 560 012, INDIA. Tel : 91-80-22933099 / 22933503(Ext:107) / 23600985 Fax : 91-80-23601428 / 23600085 / 23600683 [CES-TVR] E-mail : cestvr@ces.iisc.ernet.in, energy@ces.iisc.ernet.in, Web : http://wgbis.ces.iisc.ernet.in/energy |