WATER SITUATION IN BENGALURU |
Executive Summary
This study was undertaken to assess the quantum of water available in the region to meet the domestic demand. The study brings out that there is sufficient water available in the region, but fails to understand the inability or ineffectiveness of the local administrators to sustainably manage the water resources in the region. Sufficient water is available to meet everyone’s requirement, provided (i) water harvesting is undertaken through surface water bodies; this requires rejuvenation of lakes and reestablishment of interconnectivity; harvesting of rainwater (at decentralized levels), treatment; (ii) treatment and reuse of sewage. However, the success of sustainable water path depends on the political will, bureaucracy shedding their colonial style of functioning and more importantly citizen’s assertion for their right for equal quantity and quality of water.
Average annual rainfall in Bangalore is about 787 mm with 75% dependability and return period of 5 years. Catchment wise water yield analysis indicates about 49.5% (7.32 TMC) of water yield in the Vrishabhavathi valley (including Arkavathi and Suvarnamukhi), followed by 35.2% (5.2 TMC) in Koramangala Challaghatta valley and 15.3% (4.2 TMC) in Hebbal valley and the total annual water yield in Bengaluru is about 14.80 TMC. Domestic demand of water (at 150 lpcd) is 20.05 TMC per year (1573 MLD). This means about 73% of Bangalore’s water demand can be met by efficient harvesting of rain water. Quantification of sewage generated shows that about 16.04 TMC (1258 MLD) of sewage is generated in the city. Sewage treatment with complete removal of nutrients and chemical contaminants can be achieved by adopting decentralized treatment plants similar to the success model (secondary treatment plant integrated with constructed wetlands and algae pond) at Jakkur lake. In addition to this, water available with efficient rainwater harvesting is about 14.8 TMC. This accounts to total of 30.85 TMC of water that is available annually would cater the demand of 20.05 TMC, provided the city administration opts for decentralized optimal water management through (i) rainwater harvesting by rejuvenating lakes - the best option to harvest rain water is through interconnected lake systems, (ii) treatment of sewage generated in households in each locality (opting the model functional since 2010 at Jakkur lake – STP (Sewage Treatment Plant) integrated with constructed wetlands and algal pond; (iii) conservation of water by avoiding the pilferages (due to faulty distribution system); (iv) ensuring water supply 24x7 and (v) ensuring all sections of the society get equal quantity and quality of water. Rejuvenating lakes in the region helps in retaining the rain water. Treating sewage and options to recycle and reuse would minimize the demand for water from outside the region. However, this model of decentralised harvesting of water and reuse of treated sewage is not an attractive proposition for the current breed of decision makers with the colonial style of functioning/mind-set. The financial gain is much higher in the case of mega projects (such as water diversion) compared to these decentralised models. This is the sole reason for the local administrators to degrade decentralised water harvesting structures and alienating local community. The main reason for deliberate inefficient management of water resources is to maximise the net return for the ruling class themselves than the overall growth of the region with water security. The analysis illustrates that the city has at least 30 TMC (Bangalore city) of water, which is higher than the existing demand (20.08 TMC, at 150 lpcd and 2016 population), if the city adopts 5R’s (Rejuvenate, Retain, Recycle - Reuse, and Responsible citizens’ active participation with good governance). In order to enhance the water retaining capability in the catchment, it is essential to rejuvenate lakes and undertake large scale watershed programme (soil and water conservation). Lakes are the optimal means of rainwater harvesting at community level. This entails
Land use analysis in Bangalore City shows 1005% increase in urban (built-up) area between 1973 and 2016 i.e., from 8.0% (in 1973) to 77% (in 2016). Land use prediction using Agent Based Model showed that built up area would increase to 93.3% by 2020, and the landscape is almost at the verge of saturation.
However, these practices took backseat, during the imperial period (1800 till independence i.e. 1947) of British rule with the push for large scale river valley and canal projects and also due to lack of maintenance and management of small water harvesting structures. Apart from this, high and oppressive taxes and irrigation cess (towards the repair works of these structures) led to the decimation of irrigation tanks during the period of colonial rulers. The centralized irrigation systems coupled with increased incidences of untimely rainfall and higher temperature, lack of annual maintenance, deforestation in the catchment and receding community participation, led to the decline of thousands of traditional water harvesting systems. As a consequence of these, the thousands of lakes and tanks are silted with the decrease in the overall storage capacities and groundwater recharge. Unplanned urbanization has led to the increase in urban conglomerates, with drastic reduction in land cover of the catchment, which substantially reduced the water holding capacity of the catchment. Higher incidences of flooding and soil erosion, is the direct consequence of damaging the water harvesting structures. Therefore, it is necessary to inculcate the traditional knowledge on sustainable water harvesting and management practices in the educational curricula. At avillage/ward level it’s necessary to identify the appropriate investment strategies and make the local Panchayats/ward member responsible for the operation and maintenance of the tanks. This will help in adopting the decentralized water harvest and management practices in the arid and semi-arid regions that are economical and technically feasible alternative to meet the regional water demand.
Due to these unauthorized practices, vital constituents of the landscape (wetlands and drains,) have become breeding ground of disease vectors, stinking cesspool and emitters of GHG’s (Greenhouse gases: methane, carbon di-oxide, etc.), etc. These practices are posing serious threat to public health and hygiene with an irrecoverable loss in aquatic biodiversity. Unplanned and un-coordinated rapid urbanization has further stressed the natural resources in the region. The water demand of the urban conglomerates is met with piped water supply or from water transported from distant areas. Coupled with this, substantial degeneration of the traditional knowledge has resulted in deterioration of tank management practices. Sustainable water management of water resources through revival of traditional water harvesting strategies and comprehensive watershed restoration and management by involving local stakeholders is essential for adequate groundwater recharge and for maintaining water balance in the region.
|
Contact Address : | |||
Dr. T.V. Ramachandra Energy & Wetlands Research Group, Centre for Ecological Sciences, New Biological Sciences Building, 3rd Floor, E-Wing, Lab: TE15 Indian Institute of Science, Bangalore – 560 012, INDIA. Tel : 91-80-22933099 / 22933503(Ext:107) / 23600985 Fax : 91-80-23601428 / 23600085 / 23600683 [CES-TVR] E-mail : cestvr@ces.iisc.ernet.in, energy@ces.iisc.ernet.in, Web : http://wgbis.ces.iisc.ernet.in/energy |